This project consisted of replacing the existing HVAC system with a new variable refrigerant flow (VRF) system. The domestic hot water system was…
The project involves interior improvements to an existing two-story building, approximately 9,823 square feet. The proposed improvements include…
This project involved the replacement of the library elevator control panel.
This project included tenant improvements and seismic retrofit for an existing one-story building with a mezzanine area. The space was designed…
This is an existing 1-story converted to a school building which includes 15 classrooms, a computer lab, a chemistry lab, a science lab, a 5,016 sq ft multi-purpose room…
This is an existing 13,300 sq ft building converted into an area consisting of a multi-purpose room, physical education classrooms, stage for drama production, space for…
This was a ground-up building of Type V-A construction. This 2-story classroom building consisted of administration, multi-purpose room, 23 classrooms and 1 science…
The Master Plan project included the addition of a new middle and high school classroom buildings within the existing school campus. The existing building structures…
This is an existing site in which ten (10) new permanent portable classroom buildings as well as one (1) permanent portable restroom building were erected. The…
This is a multi-tenant building in which the charter middle school leased most of the 2nd floor (24,486 SF). The space was previously used as a nursing school…