This project involves the expansion of an existing 2-story middle school building. This 3,149 sq ft expansion will include 1 classroom and a single-use restroom on the…
This project consisted of replacing the existing HVAC system with a new variable refrigerant flow (VRF) system. The domestic hot water system was…
The project involves interior improvements to an existing two-story building, approximately 9,823 square feet. The proposed improvements include…
The scope of this project is to replace the two exiting boilers located in a 3,010 sq ft one-story service building.
This project involved the replacement of the library elevator control panel.
This project included tenant improvements and seismic retrofit for an existing one-story building with a mezzanine area. The space was designed…
This is an existing 1-story converted to a school building which includes 15 classrooms, a computer lab, a chemistry lab, a science lab, a 5,016 sq ft multi-purpose room…
This is an existing 13,300 sq ft building converted into an area consisting of a multi-purpose room, physical education classrooms, stage for drama production, space for…
This was a ground-up building of Type V-A construction. This 2-story classroom building consisted of administration, multi-purpose room, 23 classrooms and 1 science…
The Master Plan project included the addition of a new middle and high school classroom buildings within the existing school campus. The existing building structures…